Victron replacement · 48 V · two Deye 8 kW in parallel
Project Anor on two Deyes
The direct alternative to today’s Victron setup. Two Deye 8 kW hybrid inverters work as one on the same four-pack battery bank. 32 Jinko 650 W panels feed their six built-in solar trackers, so the separate chargers, their combiner boxes and the battery monitor all go. Light loads run on the joined backup outputs; heavy loads run on the GEN ports as a smart load.
Wiring schematic
The layout at a glance
Heavy loads on the GEN port
Upgrade path
Sizing checks
Do the strings and breakers suit the equipment they feed? Each check is worked out live from the datasheet numbers in the parts list, so it updates whenever the data does.
Panels make more voltage in the cold, so voltage limits are checked at the coldest cell temperature you expect.
Battery side
How these are worked out
- Cold voltage:
Voc × panels in series × (1 + |temp. coeff.| × (25 °C − coldest °C)), compared with the charger’s absolute maximum PV voltage. The temperature coefficient comes from each panel’s datasheet. - Short-circuit current:
Isc × strings in parallel, compared with the charger’s maximum PV short-circuit current. - Working current and panel power: compared with what the charger or tracker accepts. Going over isn’t unsafe; the charger trims the excess, which is called clipping.
- String fuses and breakers: IEC 62548 puts their rating between
1.5 × Iscand2.4 × Iscof one panel, and no higher than the panel’s maximum series fuse rating. - Surge protectors: their rated DC voltage should stay above the string’s cold open-circuit voltage.
- Battery side: the battery breaker at 1.25 × the inverter’s maximum battery current; inverter draw at a near-empty 48 V and about 94% efficiency; current shared evenly across the packs; panel power against each inverter’s maximum PV input.
A sanity check for readers, not a substitute for a qualified installer or Deye’s own sizing tools.